Interim Industrial Director

A seasoned industrial executive, operational within days, to hold a site, restore performance and lead the transformation of your production base.

donate

100+
companies rely on us every day

Describe your need
doordiamondInterim Industrial Directorchatdeco

Industry is interim management's biggest client. According to the France Transition barometer, manufacturing, process industries, aerospace and defence, and energy and environment concentrated around 46% of assignments in the first half of 2025, and industrial leadership alone accounted for 16% of signed assignments, second only to finance.

That ranking reflects the nature of the role. A site without a director does not stop, but it drifts fast: safety discipline slips, production trade-offs get postponed, labour relations tighten. The interim industrial director takes back control with the full executive authority of the role, where recruiting a senior executive takes twelve weeks on average according to APEC, before notice periods even start.

When to bring in an interim industrial director

A vacant site leadership role

A departure, a rushed internal move, extended leave. An industrial site cannot afford an interim handed by default to the most senior department head. The interim director holds production, safety and employee relations, and gives the group the time to recruit the right permanent hire.

Degraded industrial performance

Service levels falling, scrap rates rising, unit costs drifting. The diagnosis is often already known to the teams; what is missing is the ability to decide and to hold a performance plan over time. That is exactly what you get from a passing executive with no history to defend and no career to protect on the site.

A restructuring or closure

A capacity reduction, a production transfer, a site closure. These operations combine social constraints, customer commitments and continuity of production until the last day. They call for an executive who has led them before, and who knows how to sequence the announcement, the negotiation and the transfer.

Modernising the production base

Automation, an MES rollout, decarbonising processes, starting up a new line. The project has to advance while the plant keeps delivering: the assignment format entrusts that twin challenge to an executive who has already made the same shift elsewhere.

Typical interim industrial director assignments

The scope is set at the framing stage, but the core of the mandate almost always comes down to four responsibilities:

  • Run the site or industrial scope day to day: production, maintenance, quality, safety, workforce
  • Build and execute a quantified performance plan, with short management rituals and named owners
  • Lead a heavy operation: a reorganisation, an activity transfer, a closure, a line start-up
  • Prepare the succession: target organisation, a strengthened management team, a documented handover to the permanent hire

On a site, legitimacy is earned on the shop floor. A professional interim industrial director spends their first weeks in the workshops, not in meeting rooms.

The Bloomco approach

We present industrial executives who have already run a site comparable to yours, in size, type of production and situation faced, and whose previous principals we have called. A director who has already turned a struggling plant around is worth more than a profile from your sector who never has.

The set-up stays constant: framing with your operations leadership, two to three profiles presented within days, an engagement letter setting objectives, scope of authority and milestones, then a Bloomco lead through to handover. These mandates draw on our operations and supply chain consulting practice.

Frequently asked questions

Can an interim industrial director lead a site closure?

Yes, and it is one of the mandates where the format is most relevant: the executive has no personal future on the site, which strengthens their credibility in the negotiation, and they have already lived through the social and industrial stages of the operation.

How long should you plan for?

Average assignment length reaches 8.3 months excluding bridge assignments according to France Transition. A performance plan or a restructuring sits in that order of magnitude; a site leadership interim is often shorter.

How much does an interim industrial director cost?

France Transition puts the market's average billed rate at €1,333 per day excluding VAT for the first half of 2025. The ranges we observe on executive functions are in our day rate barometer.

Need support on your project?

Get in touch with any question, or to sharpen your brief.

Start a project
deco